A work cell is required to make 300 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. T A work cell is required to make 300 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell cumrently works an eight hour shift, of which 6.5 hours is available for productive work. What is takt time for this cel OA 13seconds OB. 96 seconds OC. 0.77 seconds OD. 46.15 seconds OE 78 seconds